| 1 |
AVTUR PIPELINE TANJUNG PERAK - JUANDA |
SURABAYA ( PERAK - JUANDA ) |
20 Month after contract signed |
PT PERTAMINA ( Persero ) |
EPC Basis |
USD. 8 Million |
Civil, Mechanical, Piping, Electrical & Control System ( Procurement, Fabrication, Instalation, test ) |
 |
| 2 |
TERMINAL LPG - PRESSURIZED |
PT. PERTAMINA (Persero) |
PESANGGARAN - DENPASAR |
20 Month after contract signed |
EPC Basis |
USD. 11.3 Million |
Civil, Mechanical, Piping, Electrical & Control System ( Procurement, Fabrication, Instalation, test ) |
 |
| 3 |
REVITALISASI PABRIK GULA |
KEMENTERIAN PERINDUSTRIAN |
PTP NUSANTARA X DAN XI |
3 Month after signing contract |
EPC Basis |
USD, 9 Million |
Procurement, Fabrication, Instalation of Various Component |
 |
| 4 |
RELOKASI DPPU - SELAPARANG |
PT. PERTAMINA ( Persero ) |
LOMBOK BARAT - NTB |
12 Month |
EPC |
USD 5 Million |
Procurement, Fabrication, Instalation, Test |
 |
| 5 |
RELOKASI DPPU - HASANUDIN |
PT REKAYASA INDUSTRI |
BANDARA HASANUDIN - MAKASSAR |
9 Month after signing contract |
MANUFACTURING |
USD 1.1 Million |
Procurement, Fabrication, Instalation |
 |
| 6 |
SPHERE TANK - JAMBI MERANG |
JOB PERTAMINA - TALISMAN |
JAMBI |
6 Month after signing contract |
MANUFACTURING BASIS |
USD 1.5 Million |
Procurement, Fabrication, Instalation SPHERICAL TANK |
 |
| 7 |
LOWER SOLO |
PPSDA BENGAWAN SOLO |
BOJONEGORO - JATIM |
45 Month after signing contract |
EPC Basis |
USD 5.8 Million |
Hydro Mechanical, Electrical & Control System ( Procurement, Fabrication, Instalation, Test ) PINTU AIR BENDUNG |
 |
| 8 |
PLTM WALESSI |
PT PLN ( Persero ) |
PAPUA |
8 Month after signing contract |
MANUFACTURING BASIS |
USD 1.1 Million |
Procurement, Fabrication, Instalation TURBIN AIR |
 |
| 9 |
PEMBUATAN GUDANG |
PT KBS |
CILEGON |
5 Month after signing contract |
CONSTRUCTION BASIS |
USD 2.5 Million |
Procurement, Fabrication, Instalation |
 |
| 10 |
TRUCK FRAME |
GE OPERATION IND. |
INDONESIA |
4 Month after signing contract |
MANUFACTURING BASIS |
USD 1.1 Million |
Procurement, Casting, Fabrication, Assembling TRUCK FRAME |
 |
| 11 |
KILN SHELL |
PT SEMEN GRESIK, In |
TUBAN - JAWA TIMUR |
4 Month after signing contract |
MANUFACTURING |
USD. 1.4 Million |
Procurement, Fabrication, Transportation, Instalation KILN SHELL |
 |
| 12 |
SEMEN TUBAN |
PT SEMEN GRESIK |
TUBAN - JAWA TIMUR |
4 Month after signing contract |
MANUFACTURING BASIS |
USD, 7.4 Million |
Fabr Mill Body, Clasifier, Preheater, Mechanical Kiln, PWHT Uper-lower Drum |
 |
| 13 |
SPHERICAL TANK |
JOB PERTAMINA - TALISMAN |
JAMBI |
6 Month after signing contract |
MANUFACTURING BASIS |
USD, 1.9 Million |
Procurement, Fabrication, Erection SPHERICAL TANK |
 |
| 14 |
MUD TANK |
PERTAMINA PDSI JAKARTA |
JAWA TENGAH |
4 Month after signing contract |
MANUFACTURING BASIS |
USD, 3.2 Million |
Proc, Fabrication, Installation MUD TANK |
 |
| 15 |
PINTU AIR |
BALAI BESAR W S |
SERAYU, CIMANUK |
4 Month after signing contract |
MANUFACTURING BASIS |
USD. 1.95 Million |
Proc, Fabrication, Instalation PINTU AIR BENDUNG DAN IRIGASI |
 |
| 16 |
Pembangunan Pabrik Kelapa Sawit |
PT Perkebunan Nusantara VI - Jambi |
Solok Selatan |
14 after Contrack |
EPC Basis |
USD. 5 Million |
Engineering, Procurement, Construction & Comissioning |
 |
| 17 |
Komponen Bogie PPCW |
PT INKA |
Madiun - Jawa Timur |
36 month |
Manufacturing basis |
8.9 Million USD |
Casting, Machining |
 |
| 18 |
Bogie S-2E CBH 965 WINGLESS |
Standard Car Truck |
Jakarta |
7 Month after signing contrack |
Manufacturing basis |
USD 2.5 Million |
Casting, Machining |
 |
| 19 |
Fabrikasi HPH |
PT Pembangkit Jawa Bali ( PJB ) |
Mojokerto Jatim |
14 Month after signing contrack |
Manufacturing basis |
USD 5.4 Million |
Procurement, Fabrication, Instalation |
 |
| 20 |
Bagasse Dryer |
PT RNI |
|
3 Month after signing contrack |
EPC Basis |
USD 3.1 Million |
Design, Matl Proc.Fabrication & Instalations
|
 |
| 21 |
Bio Ethanol |
PTP Nusantara X |
PG Gempol Kreep |
18 Month |
EPC Basis |
USD 24 Million |
Matl Proc, Fabrication, Installation, Commisioning test
|
 |
| 22 |
Bendung Gerak Tempe Sulawesi |
PT Brantas Abipraya |
Sulawesi |
8 Month |
Manufacturing basis |
USD 2.5 Million |
Matl Proc, Fabrication, Installation |
 |
| 23 |
Pipe line 40 km Banyu Urip |
PT Geo Link N |
|
7 Month after signing contrack |
EPC Basis |
USD 5.4 Million |
Engineering, Matl proc, Fabrication, Installation |
 |
| 24 |
PLTMH Kayu Aro |
PTP Nusantara VI |
Jambi |
8 Month |
EPC Basis |
USD 2 Million |
Engineering, Matl Proc, Fabrication, Installation, civil work |
 |
| 25 |
Mud Tank |
Pertamina PDSI |
|
4 Month after signing contrack |
Manufacturing basis |
USD 1.7 Million |
Matl Proc, Fabrication, Installation |
 |