Home | Contact Us | SiteMap | English English Indonesia Indonesia

  • TANDEM ROLL MILL

No

Project Name

Project Owner

Project Location

Project Schedule

Contract Type

Contract Price

Scope of Work

Picture

1 AVTUR PIPELINE TANJUNG PERAK - JUANDA PT PERTAMINA ( Persero ) SURABAYA ( PERAK - JUANDA ) 20 Month after contract signed EPC Basis USD. 8 Million Civil, Mechanical, Piping, Electrical & Control System ( Procurement, Fabrication, Instalation, test ) 01
2 TERMINAL LPG - PRESSURIZED PT. PERTAMINA (Persero) PESANGGARAN - DENPASAR 20 Month after contract signed EPC Basis USD. 11.3 Million Civil, Mechanical, Piping, Electrical & Control System ( Procurement, Fabrication, Instalation, test ) 02
3 REVITALISASI PABRIK GULA KEMENTERIAN PERINDUSTRIAN PTP NUSANTARA X DAN XI 3 Month after signing contract EPC Basis USD, 9 Million Procurement, Fabrication, Instalation of Various Component 03
4 RELOKASI DPPU - SELAPARANG PT. PERTAMINA ( Persero ) LOMBOK BARAT - NTB 12 Month EPC USD 5 Million Procurement, Fabrication, Instalation, Test 04
5 RELOKASI DPPU - HASANUDIN PT REKAYASA INDUSTRI BANDARA HASANUDIN - MAKASSAR 9 Month after signing contract MANUFACTURING USD 1.1 Million Procurement, Fabrication, Instalation 05
6 SPHERE TANK - JAMBI MERANG JOB PERTAMINA - TALISMAN JAMBI 6 Month after signing contract MANUFACTURING BASIS USD 1.5 Million Procurement, Fabrication, Instalation SPHERICAL TANK 06
7 LOWER SOLO PPSDA BENGAWAN SOLO BOJONEGORO - JATIM 45 Month after signing contract EPC Basis USD 5.8 Million Hydro Mechanical, Electrical & Control System ( Procurement, Fabrication, Instalation, Test ) PINTU AIR BENDUNG 07
8 PLTM WALESSI PT PLN ( Persero ) PAPUA 8 Month after signing contract MANUFACTURING BASIS USD 1.1 Million Procurement, Fabrication, Instalation TURBIN AIR 08
9 PEMBUATAN GUDANG PT KBS CILEGON 5 Month after signing contract CONSTRUCTION BASIS USD 2.5 Million Procurement, Fabrication, Instalation 09
10 TRUCK FRAME GE OPERATION IND. INDONESIA 4 Month after signing contract MANUFACTURING BASIS USD 1.1 Million Procurement, Casting, Fabrication, Assembling TRUCK FRAME 10
11 KILN SHELL PT SEMEN GRESIK, In TUBAN - JAWA TIMUR 4 Month after signing contract MANUFACTURING USD. 1.4 Million Procurement, Fabrication, Transportation, Instalation KILN SHELL 11
12 SEMEN TUBAN PT SEMEN GRESIK TUBAN - JAWA TIMUR 4 Month after signing contract MANUFACTURING BASIS USD, 7.4 Million Fabr Mill Body, Clasifier, Preheater, Mechanical Kiln, PWHT Uper-lower Drum 12
13 SPHERICAL TANK JOB PERTAMINA - TALISMAN JAMBI 6 Month after signing contract MANUFACTURING BASIS USD, 1.9 Million Procurement, Fabrication, Erection SPHERICAL TANK 13
14 MUD TANK PERTAMINA PDSI JAKARTA JAWA TENGAH 4 Month after signing contract MANUFACTURING BASIS USD, 3.2 Million Proc, Fabrication, Installation MUD TANK 14
15 PINTU AIR BALAI BESAR W S SERAYU, CIMANUK 4 Month after signing contract MANUFACTURING BASIS USD. 1.95 Million Proc, Fabrication, Instalation PINTU AIR BENDUNG DAN IRIGASI 15
16 Pembangunan Pabrik Kelapa Sawit PT Perkebunan Nusantara VI - Jambi Solok Selatan 14 after Contrack EPC Basis USD. 5 Million Engineering, Procurement, Construction & Comissioning 16
17 Komponen Bogie PPCW PT INKA Madiun - Jawa Timur 36 month Manufacturing basis 8.9 Million USD Casting, Machining 17
18 Bogie S-2E CBH 965 WINGLESS Standard Car Truck Jakarta 7 Month after signing contrack Manufacturing basis USD 2.5 Million Casting, Machining 18
19 Fabrikasi HPH PT Pembangkit Jawa Bali ( PJB ) Mojokerto Jatim 14 Month after signing contrack Manufacturing basis USD 5.4 Million Procurement, Fabrication, Instalation 19
20 Bagasse Dryer PT RNI 3 Month after signing contrack EPC Basis USD 3.1 Million Design, Matl Proc.Fabrication & Instalations 20
21 Bio Ethanol PTP Nusantara X PG Gempol Kreep 18 Month EPC Basis USD 24 Million Matl Proc, Fabrication, Installation, Commisioning test 21
22 Bendung Gerak Tempe Sulawesi PT Brantas Abipraya Sulawesi 8 Month Manufacturing basis USD 2.5 Million Matl Proc, Fabrication, Installation 22
23 Pipe line 40 km Banyu Urip PT Geo Link N 7 Month after signing contrack EPC Basis USD 5.4 Million Engineering, Matl proc, Fabrication, Installation 23
24 PLTMH Kayu Aro PTP Nusantara VI Jambi 8 Month EPC Basis USD 2 Million Engineering, Matl Proc, Fabrication, Installation, civil work 24
25 Mud Tank Pertamina PDSI 4 Month after signing contrack Manufacturing basis USD 1.7 Million Matl Proc, Fabrication, Installation 25
Entries Per Page
Displaying Page of